McKendree Residence
Pacific Palisades · fire rebuild · for Gefen Builders · 2026
| Trade | 03.30.00 cast-in-place concrete · 13.11.00 swimming pools |
|---|---|
| Retaining walls | 64 LF of 10" RW3 at 12′-6" wall height, plus 25 LF tied into the existing wall with epoxy-set rebar dowels |
| Foundation | 6 isolated footing pads · 5" slab on grade over 10 mil vapour retarder and 4" clean aggregate · lightweight concrete over Verco metal decking |
| Upper level | Upper-level foundation and 10" retaining walls · shotcrete building wall |
| Additional | 22′ × 10′ × 5′ pool shell · CMU wall · shoring wall and foundation underpinning |
| Concrete | 3,000 PSI minimum at footings, pads and retaining walls · 2,500 PSI slab on grade · ASTM A-615 Grade 60 reinforcing |
| Contract | $344,000 · 60 working days · 4 change orders, all executed |
Reference — pending written approval
Yuval Gefen, Gefen Builders
To be requested and approved in writing, on crew continuity through the shoring and underpinning sequence. Nothing is published here until he has signed off on the words.
Send us the drawings.